Breaking News:

This is some breaking news!

  • Another overnight closure is planned for Hwy 1 through the Fraser Canyon

    Drivers are being warned of an overnight closure on Highway 1 through the Fraser Canyon Tuesday night.

    BC’s Ministry of Transportation and Transit said the temporary closure at Tank Hill is to allow for the placement of deck concrete on a new overpass structure.

    The construction is part of ongoing repairs to Highway 1 between Lytton and Spences Bridge

    The closure is scheduled from 10 pm Tuesday, Aug. 12 to 9 am on Wednesday, Aug. 13.

    “Checkpoints with traffic-management personnel will be set up at the Highway 12 and Highway 8 intersections to provide travellers with information about alternative routes during the closures,” the province said when it announced a previous overnight closure last week.

    Emergency vehicle access will be maintained and local traffic will still be able to access the Gladwin area via Nicomen River Road.

    All other traffic will be detoured via Hwy 12 and the Coquihalla.

    Anyone travelling between the Interior and Lower Mainland can take Hwy 3 or the Coquihalla.

    All drivers are urged to keep an eye out for message boards in Cache Creek, Lillooet and Ashcroft, which will provide detour information.

    Thumbnail photo credit: BC’s Ministry of Transportation and Transit

If you appreciate what we do, we ask that you consider supporting our local independent news platform.

AD/15020739/nowmedia_sidebar_weather
Wednesday September 2
High 22°c, Low 13°c
Thursday September 3
High 21°c, Low 9°c
Friday September 4
High 23°c, Low 12°c
Saturday September 5
High 21°c, Low 11°c
Sunday September 6
High 22°c, Low 12°c
Monday September 7
High 24°c
Tuesday September 8
High 27°c, Low 13°c
AD/15020739/nowmedia_sidebar_weather

Latest Livestream

AD/15020739/nowmedia_sidebar

Top Stories

Follow Us

AD/15020739/nowmedia_sidebar
AD/15020739/nowmedia_leaderboard

More News

Content from our Sponsors

AD/15020739/nowmedia_sidebar_lower